PDA

View Full Version : Update 5


Rob Colatutto
01-27-2004, 07:56 PM
Team update 5 is out if anyone was curious.

http://www2.usfirst.org/2004comp/tmup5.pdf

Ryan M.
01-27-2004, 08:05 PM
Thanks for posting that. :)

Wetzel
01-27-2004, 09:25 PM
-> Demonstration of removing the robot from the bar is part of inspection. You can tether to do this.
-> Additional electronic components include any object that conducts electricity other than IFI relays and voltage controllers, wires, connectors and solder.
-> We wiped out the supply of 13" kickballs in the US/Canadia. There is a page of discussion about this.
->Skyway is setting up special production(limited) of 16", 20" and 24" wheels with keyway hubs like the 12.5" ones that came in the kit.


Thats the executive summary.

Wetzel
~~~~~~~~~~
Go read it anyways.