Go to Post dang. I wish my legs were as good as Dave's. - Amanda Morrison [more]
Home
Go Back   Chief Delphi > ChiefDelphi.com Website > Extra Discussion
Team 51   CD-Events   CD-Media   CD-Swap   CD-Spy   FRC-Spy   Unsung FIRST Heroes   WFA
portal register members calendar search Today's Posts Mark Forums Read FAQ rules
VEXpro
The Chief Delphi Forums are sponsored by Innovation First International, Inc.
Chief Delphi Alumni
ADVERTISEMENT

 
Reply
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 02-10-2012, 09:48 AM
waialua359's Avatar
waialua359 waialua359 is offline
Mentor
AKA: Glenn
FRC #0359 (Hawaiian Kids)
Team Role: Mentor
 
Join Date: Apr 2003
Rookie Year: 2000
Location: Waialua, HI
Posts: 2,376
waialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond repute
pic: Team 359 Teaser #1: Let the wiring begin

Reply With Quote
  #2   Spotlight this post!  
Unread 02-10-2012, 09:54 AM
electron's Avatar
electron electron is offline
Former Team Overdrive member
AKA: Joseph
FTC #2753 (Team Overdrive)
Team Role: Alumni
 
Join Date: Nov 2009
Rookie Year: 2010
Location: NJ
Posts: 76
electron is just really niceelectron is just really niceelectron is just really niceelectron is just really nice
Re: pic: Team 359 Teaser #1: Let the wiring begin

Wow, that is a very "clean" and neat looking layout, good job!
Just one question:

Why is the PD board oriented "upside down" considering the battery is behind it right side up? Wouldn't this require more of the larger gauge wire to reach the PD board from the main breaker?

PS, you are missing the breakers in your PD board. Yes, I know you know
__________________
The difference between genius and stupidity is that genius has its limits. - Albert Einstein

I may be one of the few people that has moved from FRC to FTC, and enjoyed it
Reply With Quote
  #3   Spotlight this post!  
Unread 02-10-2012, 10:33 AM
austin1743 austin1743 is offline
Head Programmer - Java
FRC #1743
Team Role: Programmer
 
Join Date: Feb 2011
Rookie Year: 2009
Location: Pennsylvania
Posts: 56
austin1743 is an unknown quantity at this point
Re: pic: Team 359 Teaser #1: Let the wiring begin

great job,

if i may ask, can you post a picture of how you mount your cRio? im always curious on those are mounted. thanks
__________________
Team 1743
Head Programmer
Reply With Quote
  #4   Spotlight this post!  
Unread 02-10-2012, 11:28 AM
Michael Corsetto Michael Corsetto is offline
It just keeps getting better!
AKA: Rex114
FRC #1662 (Raptor Force Engineering)
Team Role: Mentor
 
Join Date: May 2004
Rookie Year: 2002
Location: Bay Area/Davis/Lodi, CA
Posts: 476
Michael Corsetto has a reputation beyond reputeMichael Corsetto has a reputation beyond reputeMichael Corsetto has a reputation beyond reputeMichael Corsetto has a reputation beyond reputeMichael Corsetto has a reputation beyond reputeMichael Corsetto has a reputation beyond reputeMichael Corsetto has a reputation beyond reputeMichael Corsetto has a reputation beyond reputeMichael Corsetto has a reputation beyond reputeMichael Corsetto has a reputation beyond reputeMichael Corsetto has a reputation beyond repute
Send a message via AIM to Michael Corsetto Send a message via Skype™ to Michael Corsetto
Re: pic: Team 359 Teaser #1: Let the wiring begin

What type of chain are you using in your drive system? It doesn't look like #25, maybe I'm just seeing things...
__________________
2004-2008 - Team 114 - Human Player, Driver, Mechanical Lead, Team Co-Captain and Mentor
2008-2011 - Team 1678 - Mentor, Coach
Fall 2011 - Team 2996 - Mentor
2012-???? - Team 1662 - Lead Mentor, Coach
Reply With Quote
  #5   Spotlight this post!  
Unread 02-10-2012, 11:33 AM
jwfoss jwfoss is offline
simplicity is the key to victory
FRC #0558
Team Role: Engineer
 
Join Date: Aug 2006
Rookie Year: 2003
Location: North Haven, CT
Posts: 341
jwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond repute
Re: pic: Team 359 Teaser #1: Let the wiring begin

Quote:
Originally Posted by Michael Corsetto View Post
What type of chain are you using in your drive system? It doesn't look like #25, maybe I'm just seeing things...
I believe they use bicycle chain.
__________________
Justin W. Foss /CU 2010 / Parker APBU / EWCP / Mentor & Event Volunteer
[2013-20xx] FRC Team 0558 - Elm City Robo Squad
[2011-2013] FRC Team 2168 - Aluminum Falcons
[2007-2010] FRC Team 0229 - Division By Zero
[2003-2006] FRC Team 0176 - Aces High
Reply With Quote
  #6   Spotlight this post!  
Unread 02-10-2012, 01:36 PM
Pjohn1959's Avatar
Pjohn1959 Pjohn1959 is offline
Registered User
AKA: Paul W. Johnson
FRC #1429 (Team KAOS)
Team Role: Teacher
 
Join Date: Feb 2006
Rookie Year: 2005
Location: Galena Park, Texas
Posts: 494
Pjohn1959 has a reputation beyond reputePjohn1959 has a reputation beyond reputePjohn1959 has a reputation beyond reputePjohn1959 has a reputation beyond reputePjohn1959 has a reputation beyond reputePjohn1959 has a reputation beyond reputePjohn1959 has a reputation beyond reputePjohn1959 has a reputation beyond reputePjohn1959 has a reputation beyond reputePjohn1959 has a reputation beyond reputePjohn1959 has a reputation beyond repute
Re: pic: Team 359 Teaser #1: Let the wiring begin

Very nice job Glenn! Can't wait to see you guys in Houston
__________________

Paul W. Johnson Teacher - #1429 - Team KAOS

http://www.teamkaosrobotics.com/
2013 Chairman's Award - Lone Star
2011 Chairman's Award - Lone Star
2008 Chairman's Award - Greater Kansas City
2008 Lone Star Champions (Thanks 1477 & 57)
Reply With Quote
  #7   Spotlight this post!  
Unread 02-10-2012, 04:13 PM
waialua359's Avatar
waialua359 waialua359 is offline
Mentor
AKA: Glenn
FRC #0359 (Hawaiian Kids)
Team Role: Mentor
 
Join Date: Apr 2003
Rookie Year: 2000
Location: Waialua, HI
Posts: 2,376
waialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond repute
Re: pic: Team 359 Teaser #1: Let the wiring begin

Quote:
Originally Posted by austin1743 View Post
great job,

if i may ask, can you post a picture of how you mount your cRio? im always curious on those are mounted. thanks
We will post all of the wiring for all of our components once completed and at a later date, so we dont show "too much" of our robot.......yet. We hope to have it all done by tonight so that we can do extensive testing over the weekend.

Once all finalized, everything will be taken apart again for powdercoating in our oven in one of our shops.

Our mentor has his own autobody, woodworking, and electronics shop. He's wired cars for car shows, made custom-made stereo systems, speaker boxes, and builds/repairs cars. Best part is he is now also a full-time science/electronics teacher in our school AND member of our team.

All components are mounted with connectors so that when we take things apart for repair or powdercoating, the whole bellypan comes off with most of the components in a matter of minutes.
__________________

2013 Championship Dean's List Winner
2013 Hawaii Regional Finalist, #1 seed, Engineering Excellence Award
2013 Utah Regional Champion, #1 seed, KP&B Award, Deans List
2013 Boilermaker Regional Champion, #1 seed, Motorola Quality Award
2012 Lone Star Regional Champion, #1 seed, Motorola Quality Award
2012 Hawaii Regional Champion, #1 seed, Motorola Quality Award

2011 NYC-Regional Champion, #1 seed, Chairman's Award, Safety Award
2011 Hawaii-Regional Champion, #1 seed, Motorola Quality Award, Volunteer of the Year, Website Award
2011 Las Vegas-Regional Finalist, #2 seed, WFFA, KP&C Entrepreneurship Award,
2011 FRC World Championship-Championship Chairman's Award - 2011 Hall of Fame member
2011 IRI-Tournament Champions

2010 Hawaii Regional Champion, #1 seed, Engineering Excellence, WFFA
2010 Arizona Regional Champion, #1 seed, Entrepreneurship Award, Teacher of the Year Award, Coopertition Award, Chairman's Award
2010 San Diego Regional Champion
2010 IRI Champions, #1 seed
Reply With Quote
  #8   Spotlight this post!  
Unread 02-10-2012, 04:15 PM
waialua359's Avatar
waialua359 waialua359 is offline
Mentor
AKA: Glenn
FRC #0359 (Hawaiian Kids)
Team Role: Mentor
 
Join Date: Apr 2003
Rookie Year: 2000
Location: Waialua, HI
Posts: 2,376
waialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond repute
Re: pic: Team 359 Teaser #1: Let the wiring begin

Quote:
Originally Posted by Michael Corsetto View Post
What type of chain are you using in your drive system? It doesn't look like #25, maybe I'm just seeing things...
We've used bicycle chain for many years now.
Strong like 35 chain, but light like the 25 chain. No issues whatsoever!
__________________

2013 Championship Dean's List Winner
2013 Hawaii Regional Finalist, #1 seed, Engineering Excellence Award
2013 Utah Regional Champion, #1 seed, KP&B Award, Deans List
2013 Boilermaker Regional Champion, #1 seed, Motorola Quality Award
2012 Lone Star Regional Champion, #1 seed, Motorola Quality Award
2012 Hawaii Regional Champion, #1 seed, Motorola Quality Award

2011 NYC-Regional Champion, #1 seed, Chairman's Award, Safety Award
2011 Hawaii-Regional Champion, #1 seed, Motorola Quality Award, Volunteer of the Year, Website Award
2011 Las Vegas-Regional Finalist, #2 seed, WFFA, KP&C Entrepreneurship Award,
2011 FRC World Championship-Championship Chairman's Award - 2011 Hall of Fame member
2011 IRI-Tournament Champions

2010 Hawaii Regional Champion, #1 seed, Engineering Excellence, WFFA
2010 Arizona Regional Champion, #1 seed, Entrepreneurship Award, Teacher of the Year Award, Coopertition Award, Chairman's Award
2010 San Diego Regional Champion
2010 IRI Champions, #1 seed
Reply With Quote
  #9   Spotlight this post!  
Unread 02-10-2012, 04:59 PM
ratdude747's Avatar
ratdude747 ratdude747 is offline
Registered User
AKA: Larry Bolan
no team
Team Role: College Student
 
Join Date: Feb 2009
Rookie Year: 2008
Location: New Albany, IN
Posts: 720
ratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant future
Send a message via Skype™ to ratdude747
Re: pic: Team 359 Teaser #1: Let the wiring begin

why are all eight 40A spots used when there are only 4 allowed 40A devices (the 4 CIMs) legal?

sorry, but such a config would not pass inspection.
__________________

Dean's List Semi-finalist 2010
1747 Harrison Boiler Robotics 2008-2010
2783 Engineers of Tomorrow 2011
How to wire CAN bus on a budget
Reply With Quote
  #10   Spotlight this post!  
Unread 02-10-2012, 05:14 PM
AdamHeard AdamHeard is offline
Lead Mentor
AKA: OUTWORK US
FRC #0973 (GRR)
Team Role: Mentor
 
Join Date: Oct 2004
Rookie Year: 2004
Location: Cal Poly San Luis Obispo
Posts: 3,564
AdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond repute
Send a message via AIM to AdamHeard
Re: pic: Team 359 Teaser #1: Let the wiring begin

Incorrect.

Quote:
Originally Posted by ratdude747 View Post
why are all eight 40A spots used when there are only 4 allowed 40A devices (the 4 CIMs) legal?

sorry, but such a config would not pass inspection.
__________________
2011 World Champions

Follow 973 on twitter, @FRC973

Like our Robots? Check out the CAD files of ALL our robots!

Reply With Quote
  #11   Spotlight this post!  
Unread 02-10-2012, 05:22 PM
EricH's Avatar
EricH EricH is offline
...has read the 2012 Manual
FRC #0330 (Beach'Bots)
Team Role: Engineer
 
Join Date: Jan 2005
Rookie Year: 2003
Location: SoCal
Posts: 14,273
EricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond repute
Send a message via Skype™ to EricH
Re: pic: Team 359 Teaser #1: Let the wiring begin

Quote:
Originally Posted by ratdude747 View Post
why are all eight 40A spots used when there are only 4 allowed 40A devices (the 4 CIMs) legal?

sorry, but such a config would not pass inspection.
Whaddayamean, only 4 allowed 40A devices?

Quote:
[R43]
All active PD Board branch circuits shall be protected from overload with an appropriate value auto resetting Snap
Action circuit breaker. Specifically,
A. Each speed controller branch circuit must be protected by one and only one 20-amp, 30-amp, or 40-amp circuit breaker on the PD Board (from the KOP or identical equivalent). No other electrical load can be connected to the breaker supplying this circuit.
[snip]

[R44]
All active circuits shall be wired with appropriately sized wire:
Application Minimum wire size
40A circuit 12 AWG (2.052mm)
30A circuit 14 AWG (1.628mm)
20A circuit 18 AWG (1.024mm)[snip]
Oh, and only the CIMs and FPs are required to have speed controllers. Everything else can be run off a Spike, restricting it to 20A--but that's still 6 speed controllers, any of which can be run at 40A!
__________________
Paths a rules question takes:

Official: Post to Q&A-->GDC reviews-->Official answer posted on Q&A.

Unofficial: Post to CD-->CD views and comments, sometimes using The Manual and interpreting it-->Somebody goes the Official route -->Answer gets posted on CD eventually, as a quote from Q&A.

Which one takes longer for an official ruling? Therefore, which one makes more sense to use?
Reply With Quote
  #12   Spotlight this post!  
Unread 02-11-2012, 08:11 PM
ratdude747's Avatar
ratdude747 ratdude747 is offline
Registered User
AKA: Larry Bolan
no team
Team Role: College Student
 
Join Date: Feb 2009
Rookie Year: 2008
Location: New Albany, IN
Posts: 720
ratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant futureratdude747 has a brilliant future
Send a message via Skype™ to ratdude747
Re: pic: Team 359 Teaser #1: Let the wiring begin

Quote:
Originally Posted by EricH View Post
Whaddayamean, only 4 allowed 40A devices?

Oh, and only the CIMs and FPs are required to have speed controllers. Everything else can be run off a Spike, restricting it to 20A--but that's still 6 speed controllers, any of which can be run at 40A!


whoops!

Still used to the old cim=40A, FP=30A, everything else= 20A rule...

Sorry about that...
__________________

Dean's List Semi-finalist 2010
1747 Harrison Boiler Robotics 2008-2010
2783 Engineers of Tomorrow 2011
How to wire CAN bus on a budget
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 04:44 AM.

The Chief Delphi Forums are sponsored by Innovation First, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.
Copyright © Delphi and Pontiac Central High School