OCCRA
Go to Post ...and then at the end they interviewed this 5 year old on his favorite part (of the fair): "I liked the robot" - Jessica Boucher [more]
Home
Go Back   Chief Delphi > CD-Media > White Papers
CD-Events   CD-Media   CD-Spy   FRC-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

photos

papers

everything



Spectrum 3847 Build Log 2012

AllenGregoryIV

By: AllenGregoryIV
New: 06-07-2012 03:20 PM
Updated: 06-07-2012 03:20 PM
Total downloads: 197 times


Our build log from the 2012 FRC Season.

This is the compiled version of our 2012 build log. It was originally posted to our blog (3847.blogspot.com). It was updated everyday of build season. A lot things have changed on the robot since build season ended; in the future we are going to try to do this all the way through our last competition.

Attached Files

  • pdf Spectrum 3847 Build Log 2012

    Spectrum 3847 Build Log 2012.pdf

    downloaddownload file

    uploaded: 06-07-2012 03:20 PM
    filetype: pdf
    filesize: 1.82MB
    downloads: 195



Recent Downloaders

Discussion

view entire thread

Reply

06-13-2012 10:45 AM

JVN


Unread Re: paper: Spectrum 3847 Build Log 2012

Allen,
This is great! I love the inspirational quotes you included. Kudos to your team on a great season, and for documenting your experience.

-John



06-13-2012 11:47 PM

AllenGregoryIV


Unread Re: paper: Spectrum 3847 Build Log 2012

Thanks John, your build logs inspired this. I hope more teams start to do this in the future.

Some of my students are thinking about doing them along side mine, so we might get a build season of the same robot from different perspectives next year.

Hopefully, I'll see you at TRR this summer.



view entire thread

Reply

Tags

loading ...



All times are GMT -5. The time now is 10:53 PM.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi