About the Field Building category
|
|
0
|
169
|
February 25, 2019
|
Infinite Recharge at Home - Power Port Safety Precaution
|
|
1
|
406
|
March 21, 2021
|
How to hold carpet down temporarily
|
|
13
|
675
|
March 1, 2021
|
Carpet Needed! (FMA)
|
|
5
|
433
|
February 18, 2021
|
FRC Carpet odor
|
|
33
|
1544
|
January 28, 2021
|
Finally! A portable FLL size table that works!
|
|
1
|
474
|
July 16, 2020
|
Placement of the SHIELD GENERATOR Structure on field
|
|
19
|
1216
|
February 24, 2020
|
Rendevouz Truss - No Load Version at 841 half field
|
|
2
|
734
|
February 23, 2020
|
Field Carpet Needed!
|
|
17
|
1139
|
February 3, 2020
|
Those who have built the team version Generator Switch - 1 11/16" bit or hole saw?
|
|
3
|
339
|
January 27, 2020
|
Infinity Recharge Field Assembly Manual?
|
|
2
|
265
|
January 20, 2020
|
Aftermath of Field Building - Hex bolts and Tee-Nuts
|
|
1
|
426
|
January 19, 2020
|
Need help with some adding - width not adding up
|
|
1
|
166
|
January 17, 2020
|
AndyMark Selling Production CONTROL PANEL and Stickers
|
|
26
|
1254
|
January 17, 2020
|
Updated Field Building Spreadsheet with 2020 field pieces
|
|
11
|
1114
|
January 14, 2020
|
Table of contents for FIRST-supplied Half-Field Drawings
|
|
0
|
274
|
January 14, 2020
|
Modified Trench Top for vision from below
|
|
2
|
485
|
January 14, 2020
|
Making a competition equivalent Hanger
|
|
2
|
477
|
January 12, 2020
|
Tip if you just need the power port vision target
|
|
0
|
395
|
January 12, 2020
|
Reusing the rocket for 2020
|
|
2
|
746
|
January 11, 2020
|
Arm gearbox
|
|
9
|
482
|
January 11, 2020
|
Printable Control Panel Files
|
|
8
|
1067
|
January 10, 2020
|
Partial Index to Season-Specific Game Pieces
|
|
2
|
406
|
January 8, 2020
|
Missing Part TE-20000-10
|
|
11
|
660
|
January 7, 2021
|
Switch Field Element
|
|
2
|
489
|
January 7, 2020
|
Half Practice Field for 4360, 7048 & Bison Robotics Ri3D
|
|
9
|
1180
|
January 7, 2020
|
Simpler A-Frame for team-built Shield Generator?
|
|
0
|
294
|
January 6, 2020
|
Where can you find 1 1/4 schedule 40 iron pipe for an Infinite Recharge practice field
|
|
16
|
832
|
January 6, 2020
|
2020 Field Cutlist and Sketchup Models
|
|
6
|
1052
|
January 5, 2020
|
Missing part drawing?
|
|
3
|
313
|
January 5, 2020
|