archiver
23-06-2002, 23:05
Posted by Tom Dissington.
Coach on team #3920, NASA, York Tech and Clover H.S., from Clover High School and York Tech, NASA.
Posted on 2/8/2000 10:59 AM MST
Hello all,
I have 2 questions.
#1 My kids seem to think that we need a very detailed schematic, preferable cad designed, about all aspects of robot construction. It is their impression that this is needed for inspection at the regionals and national. Any truth?
#2 We are taking a guard rail approach to robot protection, as oppossed to a bumper. We using 1/4' thick U-channel around a wooden base toped with tubular aluminum to make a type of picket fence around the perimeter. Does anyone think this will be a problem?
Coach on team #3920, NASA, York Tech and Clover H.S., from Clover High School and York Tech, NASA.
Posted on 2/8/2000 10:59 AM MST
Hello all,
I have 2 questions.
#1 My kids seem to think that we need a very detailed schematic, preferable cad designed, about all aspects of robot construction. It is their impression that this is needed for inspection at the regionals and national. Any truth?
#2 We are taking a guard rail approach to robot protection, as oppossed to a bumper. We using 1/4' thick U-channel around a wooden base toped with tubular aluminum to make a type of picket fence around the perimeter. Does anyone think this will be a problem?