archiver
23-06-2002, 23:37
Posted by Raul at 1/25/2001 10:28 AM EST
Engineer on team #111, Wildstang, from Rolling Meadows & Wheeling HS and Motorola.
Notice that perforated sheet stock is allowed.
Also notice that the 5" steel plate at the end of the bridge now extends out 4" instead of 3". I think FIRST is making a mistake doing this - the 1" overlap with the carpet/plywood is much weaker than with a 2" overlap.
Raul
Engineer on team #111, Wildstang, from Rolling Meadows & Wheeling HS and Motorola.
Notice that perforated sheet stock is allowed.
Also notice that the 5" steel plate at the end of the bridge now extends out 4" instead of 3". I think FIRST is making a mistake doing this - the 1" overlap with the carpet/plywood is much weaker than with a 2" overlap.
Raul