23-06-2002, 23:37
Posted by Raul at 1/25/2001 10:28 AM EST


Engineer on team #111, Wildstang, from Rolling Meadows & Wheeling HS and Motorola.



Notice that perforated sheet stock is allowed.

Also notice that the 5" steel plate at the end of the bridge now extends out 4" instead of 3". I think FIRST is making a mistake doing this - the 1" overlap with the carpet/plywood is much weaker than with a 2" overlap.

Raul

archiver
23-06-2002, 23:37
Posted by Ken Leung at 1/25/2001 2:09 PM EST


Student on team #192, Gunn Robotics Team, from Henry M. Gunn Senior High School.


In Reply to: Update #5 is out
Posted by Raul on 1/25/2001 10:28 AM EST:



Normally when the side of the ramp is down and the steel plate is just sitting at the end of the ramp and lying on the ground, the plate is probably just as strong... but when the bridge is balanced, and there is something sitting on top of that plate, you are right, it's going to be a lot weaker, might even risk breaking the plate off the ramp. I think FIRST did this so there will be a longer length on the bridge. We figured out if a robot is to balance two goals on the bridge in between, it will have to be pretty narrow length wise, and now we have a little more room to play with, even though 2" isn't too much of a gain... After all, with the tight dimension in between the two goals, 2" extra space probably made lots of people a lot happier and their lives a lot easier.