Engineer on team #330, Beach Bot, from Hope Chapel Academy and NASA/JPL , J&F Machine, and Raytheon.
Because of the number of switches and LEDs that we want to have on our operator interface, we need to run the cable from one of our joysticks into the project box and disconnect some of the signals and add some others. Is it going to be a problem to use a 6 foot cable to the project box and then have a few inches of 24 gauge wire inside the project followed by 6 more feet of cable?
Engineer on team #330, Beach Bot, from Hope Chapel Academy and NASA/JPL , J&F Machine, and Raytheon.
Because of the number of switches and LEDs that we want to have on our operator interface, we need to run the cable from one of our joysticks into the project box and disconnect some of the signals and add some others. Is it going to be a problem to use a 6 foot cable to the project box and then have a few inches of 24 gauge wire inside the project followed by 6 more feet of cable?