pic: Day 2: Field elements completed
|
Re: pic: Day 2: Field elements completed
How heavy is your pyramid and what design did you follow to create it?
|
Re: pic: Day 2: Field elements completed
we used the team field drawings to create the pyramid. Instead of using gussets we welded the 1 and 1/2" tube together.
We thought the black 1 and 1/2" pipe was cost prohibitive so we found a ton of galvanized steel pipe and decided to use that. The diameter was a bit off (1.66") but I think it will work for our purposes. It can easily be pick up by two students, but I think you would need three to move it because of the size of the item. |
Re: pic: Day 2: Field elements completed
Where are you storing all of it? How structurally sound is it? Also, do you plan on putting the basket on top? Looks great.
|
Re: pic: Day 2: Field elements completed
I hope you were careful welding galvanized pipe. Zinc oxide fumes can be very unpleasant. Here is one discussion of welding galvanized steel, in case there are other readers interested.
|
Re: pic: Day 2: Field elements completed
We have an awesome built site with an excited mentor who is letting us take over a portion of their space for the season. The small goal fits inside the large one so that helps with storage.
The Pyramid seems to be holding up. We has 150 lbs mentor hanging in it at the end of the day. The guys who helped build it suggested a weight limit of 300 lbs per rung. |
Re: pic: Day 2: Field elements completed
Looks great! Am I misreading something, or is the size of the pipe 1-1/4", not 1-1/2?
|
Re: pic: Day 2: Field elements completed
Quote:
|
Re: pic: Day 2: Field elements completed
Oh 1086, you guys make me more and more jealous of you everyday. First your Legen-Dairy drive system, and now this! I wish we got to see you guys more often; we've missed you since Virginia '11! Amazing work, as always. That's a "muenster" of a task to get done in one day!
Is that a team car in the background? ;) You're also missing the pyramid goal in this picture, but I'm sure that little "feta" is around there somewhere. :D |
Re: pic: Day 2: Field elements completed
Quote:
|
Re: pic: Day 2: Field elements completed
Hey Ryan!
You wouldnt believe how much we miss seeing you guys. We all really hope to run into you again at Champs! Working with FRC bots from New Jersey is as good as having an M1 Abrams on your side! That's actually the main sponsor's car that they are fixing up and integrating their own products with! (Powertrain Control Systems) The top we are going to slap on at some other point, we just wanted to get the main structural body welded together. And yes, we had the bay doors open and other precautions in place to counter the welding process side-effects. |
Re: pic: Day 2: Field elements completed
I think the confusion comes from pipe vs tubing. Tubing is measured o.d. pipe is measured I.D. The official field uses 1.5" DOM tubing, the "cheap" field uses 1 1/4" pipe (slightly larger than 1.5"). Pipe is much cheaper.
|
Re: pic: Day 2: Field elements completed
We also got our Field Elements built today. Except we built the entire field wall. Click the link below to see them.
One might be asking, why did they do this? The answer.. Because we're crazy. And we're really lucky and have room to store them. And we want to visualize the whole field while we design and build. One of our sponsors is building the Pyramid from cold rolled steel for us. We like hosting off season events so we knew we would build the whole field elements at some point. Might as well be at the beginning of the season... http://imgur.com/IDOSR |
Re: pic: Day 2: Field elements completed
We (the alumni) have been working on the field too, but we decided to use the black pipe and only build half of the pyramid. Originally the plan was to use something cheaper to build the pyramid, but then there was concern about bending of the practice pyramid not being the same as the competition pyramid.
I have to say that's a really nice space. It even looks like you could fit a full field in there. |
Re: pic: Day 2: Field elements completed
Quote:
|
Re: pic: Day 2: Field elements completed
Do you have any other ideas as to what we could build it out of? I don't think our sponsor will let us weld things, so preferably something that snaps lol.
|
Re: pic: Day 2: Field elements completed
http://www.usfirst.org/roboticsprogr...-where-and-how
Check out this link and look for the "team drawing" section. This has a design that is held together by u-bolts. It should be able to be disassembled. |
Re: pic: Day 2: Field elements completed
And it has step by step assembly. Thanks!
|