![]() |
Metal strips on ends of bridge
Posted by Mike Fenton at 1/24/2001 7:33 PM EST
Engineer on team #121, Rhode Warrior, from Middletown High School and NUWC. i looked at the dwgs and it seems that the 5 inch metal strips hang over the platform ends by 3 inches. Does the part attached to the plywood go over the carpet or under the carpet? |
Re: Metal strips on ends of bridge
Posted by Brian at 1/24/2001 7:59 PM EST
Student on team #56, Robbe Xtreme, from Bound Brook High School and Ethicon Inc.. In Reply to: Metal strips on ends of bridge Posted by Mike Fenton on 1/24/2001 7:33 PM EST: It goes over the carpet |
update 5... metal strip hanging out longer
Posted by Ken Leung at 1/25/2001 5:10 AM EST
Student on team #192, Gunn Robotics Team, from Henry M. Gunn Senior High School. In Reply to: Metal strips on ends of bridge Posted by Mike Fenton on 1/24/2001 7:33 PM EST: According to team update 5, the metal strips are hanging out 4 inches from the platform ends instead of 3inches. |
| All times are GMT -5. The time now is 01:39 AM. |
Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi