Chief Delphi

Chief Delphi (http://www.chiefdelphi.com/forums/index.php)
-   General Forum (http://www.chiefdelphi.com/forums/forumdisplay.php?f=16)
-   -   Ramp BOM (http://www.chiefdelphi.com/forums/showthread.php?t=15763)

David Kelly 05-01-2003 20:15

Quote:

Originally posted by rolocroz
At the San Jose remote kickoff, I saw some people looking at a blueprint of the field; I thought that that might be included in our kit. Apparently not -- but now I know that such a blueprint exists.
it should have come with your manual.

viper 05-01-2003 20:58

O_O?
 
is the blueprint in the manual the same as it is in the website?? because we didnt get the kit yet.....:(

Rob Colatutto 05-01-2003 21:12

we all got the blueprints, check in your teams official game manual

Mr.G 06-01-2003 13:20

Has anyone found a good drawing yet of how to build the platform and ramps? The drawing that came with the rulebook is about useless. Last years goal drawing was good.

DaBruteForceGuy 06-01-2003 13:54

Quote:

Originally posted by Eagle Master
Has anyone found a good drawing yet of how to build the platform and ramps? The drawing that came with the rulebook is about useless. Last years goal drawing was good.
Actually, if i could remember, last years goal blueprints were a little hard to read when trying to build it from scratch. *or maybe it's just the tools i had availible to me:rolleyes: *

Rich Wong 06-01-2003 14:06

Cheap Ramp Structure BOM
 
Modified BOM of Ramp Structure
used at NYC Remote Kickoff: $230
for 2 ramps and 1 platform
Everything is from Home Depot except the wire mesh floor.

-----------------------------
A single ramp
5 2x6x8 ft.
1 2x6x4 ft.
1 2x4x4 ft,
-----------------------------
Ramp side panels
2 2x4x1/4 plywood
1 1x6x8 ft. (side rail)
-----------------------------
A single platform Section
5 2x6x 5'9" (use end pieces for legs)
2 2x6x 4 ft.
4 2x6x 1'11.5" (see item 1)
2 2x4x 3'10.5"
2 1x4x 5'9"
-----------------------------
Platform floor
3 2x4x1/4 plywood
-----------------------------
Platform side panel
1 2x4x1/4 plywood
-----------------------------
2 4x8 wire mesh $50 at McNichols Co.

*Contructure Time: 2 people for 10 hours.
(will post pictures soon)

Good Luck!:)

laurence 07-01-2003 15:00

Mesh & HDPE are really important!
 
The traction on the mesh and (lack of it on the) HDPE are really important to understand. The HDPE was fairly slippery on the top. The mesh makes it hard to push bins up or down.


All times are GMT -5. The time now is 09:55.

Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi