Chief Delphi

Chief Delphi (http://www.chiefdelphi.com/forums/index.php)
-   General Forum (http://www.chiefdelphi.com/forums/forumdisplay.php?f=16)
-   -   is your team behind? (http://www.chiefdelphi.com/forums/showthread.php?t=17197)

angier314 30-01-2003 20:58

is your team behind?
 
I was wondering if any other team is very far behind. :(

Duke 13370 30-01-2003 21:12

YES!!! (that's bad)

Yan Wang 30-01-2003 21:13

Y.. NO!

Forsaken85 30-01-2003 21:22

behind bah
 
Wow we are so ahead but then we hint a stone and tripped and recoverd. Everyone is either behind or ahead for light years. You learn to manage your time on certain things and then you will not behind. Team 303 is well ahead and moving at a fast pase. It all depends if your teams works fast or slow to. Making a schdule will help and figure what needs to get done. Just suggesting latter and out. GO team303"""":cool:

pauluffel 30-01-2003 21:24

We"re very much behind, but hopefully we"ll start having 10hr meetings and catch up soon. We also have one very small member who is one of the best workers on the team, so we're hoping to ship him with the robot, so it's done by the time we take it out of the crate at regionals.

D. Gregory 30-01-2003 21:24

We are a week behind. I'm not worried, we have had huge problems getting teacher supervision until now. We are moving in high gear. It always works out.

ChewyMasterFlex 30-01-2003 21:33

let's say we test drove the prototype of the drivesystem...yet to produce designs for the arms... is that behind?

MBiddy 30-01-2003 21:46

This trick is to be so far behind that you cycle around to the front again, and then you are ahead.

David Kelly 30-01-2003 21:51

i think that we are actually a day or two ahead of where we were this time last year. we're doing pretty well right now :cool:

HolyMasamune 30-01-2003 21:59

Most of our teams are nearly done with the building, but we realized that we had to make a big change of plans...so i guess you can say we're a bit behind, but not that much.

Gamer930 30-01-2003 22:01

Team 930 has:
A chassie
All special functions attached

Planning on having all controls mounted and moving by the end of the day on monday (in about 11 team working hours we are planning on having a moveable parts)

We are allowing us a lot of time for Automonous programming and testing. We have a basic automonous program done but will need fine tuneing.

About this time last year we were just finishing design :-)

Joe Matt 30-01-2003 22:07

I don't know if I'm going to get the CHAINSAW (:ahh: ) for this, but, yes Team 384 is behind (but we like to be safe.) We have a frame. I'll leave it at that or I KNOW I'll get the Chainsaw. (NOooooo!!! Don't hurt me!!)

D.J. Fluck 30-01-2003 22:11

You are never behind unless its time to ship the robot and all you have is scattered parts.
:D

Todd Derbyshire 30-01-2003 22:14

Um we finished the arm for our first bot and robot two is fully functioning. They should be both be running by Saturday. If not then we are behind schedule.

JVN 30-01-2003 22:33

Quote:

Originally posted by D.J. Fluck
You are never behind unless its time to ship the robot and all you have is scattered parts.
:D

That's what the air-holes in the crate are for.
We pop the crate at regionals and find a pretty finished robot, and an engineer who needs a shave...


All times are GMT -5. The time now is 23:00.

Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi