![]() |
Off-board relief question
With the recent posting of the inspection checklist, does anyone else have a problem with the (2) relief valve requirement?
|
Re: Off-board relief question
I'm not sure that the requirement for the relief valve wasn't in the rules last year. Note that this is only for teams using the compressor to pre-pressurize the robot before the match, not teams that have the compressor on board the robot.
What caught my attention, however, was this: Quote:
Probably needs a Q&A if it isn't revised shortly. Thanks for pointing out that the inspection checklist has been published... or at least Rev. A has! Jason |
Re: Off-board relief question
http://forums.usfirst.org/showthread.php?t=11773
I've been vindicated (regarding 2 safety relief valves) ;) Not so lucky on part 2 though - Regarding the High-Pressure Regulator question - the checklist is wrong and needs to be fixed. Thanks for the catch! The same error actually occurs for the Working-Pressure Regulator checklist item. For starters, there isn't actually any need for a 120PSI regulator since it's the switch and relief valve that "regulate" to 120PSI. I don't have a good excuse for the error. Whoops... Rule R73 doesn't require that any regulators be present on the robot. Rule R75-D suggests that the Norgren 60PSI regulator may be off-robot and further requires that, if the Norgren regulator is off-robot, then the on-robot accumulators must be limited to 60PSI. I'll update the checklist (I'm sure that this won't be the first time). Sorry for any confusion. Russ |
| All times are GMT -5. The time now is 16:40. |
Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi