Chief Delphi

Chief Delphi (http://www.chiefdelphi.com/forums/index.php)
-   Extra Discussion (http://www.chiefdelphi.com/forums/forumdisplay.php?f=68)
-   -   pic: THINK PINK Roccobot 2k9 base electrical work (http://www.chiefdelphi.com/forums/showthread.php?t=75742)

Gabe Salas Jr. 11-03-2009 23:54

pic: THINK PINK Roccobot 2k9 base electrical work
 

samir13k 11-03-2009 23:55

Re: pic: THINK PINK Roccobot 2k9 base electrical work
 
AHHHH:ahh: So many Victors!!!!! It's such a beautiful thing!:D

Billfred 12-03-2009 07:26

Re: pic: THINK PINK Roccobot 2k9 base electrical work
 
Once again, Pink shows how what an electrical board can be. Color me envious.

Team 135 12-03-2009 10:40

Re: pic: THINK PINK Roccobot 2k9 base electrical work
 
That looks great, our bot usually start out looking that good, but by the time we get to a competition, it has lost its good looks.

Wetzel 12-03-2009 11:05

Re: pic: THINK PINK Roccobot 2k9 base electrical work
 
Hopefully you guys isolate from the chassis and don't blow everything up with the static issues we've been seeing this year.

I always like to see clean wiring. :)

Wetzel

mtaman02 15-03-2009 02:08

Re: pic: THINK PINK Roccobot 2k9 base electrical work
 
very clean wiring setup something thats a completely rare site

amariealbrecht 15-03-2009 11:57

Re: pic: THINK PINK Roccobot 2k9 base electrical work
 
From a girl thats on the electrical subteam on the Robettes, it looks clean and very organized. Good work!!
Best of luck in the rest of the season!!

AlexD744 15-03-2009 16:54

Re: pic: THINK PINK Roccobot 2k9 base electrical work
 
Quote:

Originally Posted by amariealbrecht (Post 836164)
From a girl thats on the electrical subteam on the Robettes, it looks clean and very organized. Good work!!
Best of luck in the rest of the season!!

Now if only the rest of it was put together like this in the crate :p . And where's the LED sensor controls (I think that's what they were).

amariealbrecht 15-03-2009 18:29

Re: pic: THINK PINK Roccobot 2k9 base electrical work
 
Quote:

Originally Posted by AlexD744 (Post 836260)
Now if only the rest of it was put together like this in the crate :p . And where's the LED sensor controls (I think that's what they were).

hahha...im sure it put together nicely...just like in the pic lol :)

acdcfan259 15-03-2009 20:43

Re: pic: THINK PINK Roccobot 2k9 base electrical work
 
I'm very happy/surprised to say that the electrical on our robot is comparable to the PINK team in cleanliness and organization this year.

NickE 15-03-2009 20:47

Re: pic: THINK PINK Roccobot 2k9 base electrical work
 
Quote:

Originally Posted by acdcfan259 (Post 836382)
I'm very happy/surprised to say that the electrical on our robot is comparable to the PINK team in cleanliness and organization this year.

I like to think that ours is too.

ducttapedude 15-03-2009 21:06

Re: pic: THINK PINK Roccobot 2k9 base electrical work
 
Quote:

Originally Posted by NickE (Post 836388)
I like to think that ours is too.

Quite comparable :D

FlyingHedgeHog 19-03-2009 19:22

Re: pic: THINK PINK Roccobot 2k9 base electrical work
 
Now THAT is one good looking robot. Or, electrical board at least. Either way, looks good.

Chief Pride 19-03-2009 20:25

Re: pic: THINK PINK Roccobot 2k9 base electrical work
 
Quote:

The chassis for the cRIO Mobile Device Controller and the supplied camera have
grounded enclosures. Under this rule (and for their protection), it is REQUIRED that
they be electrically isolated from the ROBOT frame when installed on the ROBOT.
Under <R41>.

ducttapedude 19-03-2009 21:07

Re: pic: THINK PINK Roccobot 2k9 base electrical work
 
Quote:

Originally Posted by Chief Pride (Post 838347)
Under <R41>.

It's isolated, don't worry, even if it doesn't look like it.

:D


All times are GMT -5. The time now is 03:39.

Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi