![]() |
Team 135 Field Done!
As always team 135 has the field done on the first day. At 11 pm, we added the last piece and called it complete.
We do not have foam, because it had to be ordered. We only have one upright and a tunnel at the other bump, only one end of the field. Check out the pics on my facebook at this link http://www.facebook.com/album.php?ai...3&l=9048ea2d04 |
Re: Team 135 Field Done!
Quick construction! Thanks for putting pics up, it's nice to be able to see it when I couldn't make it to the Kickoff. :)
|
Re: Team 135 Field Done!
Wow, that was fast! Good job!
|
Re: Team 135 Field Done!
That is an amzing feat to complete it so quickly. How many people did you have working on it?
|
Re: Team 135 Field Done!
Quote:
I'm jealous, I wish we had a place to build our own field. |
Re: Team 135 Field Done!
That's crazy!!! Good job on the quick construction!
|
Re: Team 135 Field Done!
all i can saw is wow that was fast nice job guys!
|
Re: Team 135 Field Done!
I wonder which team this week will claim their bot is finished and ask to use your field.
Nice work, 135. Can you let us know how much of the far part of the field isn't viewable from your alliance station because of the bumps? |
Re: Team 135 Field Done!
Awww! I want one of those.;) Nice job with getting that done in less that 12 hours.:)
|
Re: Team 135 Field Done!
Quote:
Sweet job guys, I'm jealous. |
Re: Team 135 Field Done!
We had around 10 parents and the normal 5 mentors there to build it. There is little to no visual obstuction of the far wall.
Our goal is always to have it up before we do any planning. |
Re: Team 135 Field Done!
Quote:
|
Re: Team 135 Field Done!
Quote:
|
Re: Team 135 Field Done!
Let me clarify, what was stated before was in addition to the entire student team, minus the 2-5 who went to the kickoff.
|
Re: Team 135 Field Done!
It's only the field, though, so while the students could still learn when building the field, there should be nothing wrong with the adults handling it.
|
Re: Team 135 Field Done!
Quote:
Wow! Are you guys coming to Muncie Scrimmage this year? *hint* *hint*... |
Re: Team 135 Field Done!
Quote:
|
Re: Team 135 Field Done!
Great job, it looks great!
Where did you order the foam, I cannot find any info on it in the FIRST drawings or field description. We were thinking of buying a Mattress Topper from Costco or Sams. I saw one on Amazon too but am not sure how thick it should be. Seems we can get 1.5 - 3 inches thick. Also foam desity varies with supplier. http://www.amazon.com/Serta-3-Pound-.../dp/B000BI3OWW :ahh: |
Re: Team 135 Field Done!
Wow that is amazing!
Team 2502 was kicked out of our high school at 8PM without any advance notice. Monday morning will be some hectic cleaning before classes start ;-) |
Re: Team 135 Field Done!
Excellent you beat us! Are you pumped?
|
Re: Team 135 Field Done!
The pics were kind of small so I couldn't tell for sure, but it looks like there are no vision targets on that field. Could you not determine the dimensions of the target? I don't see anything in the drawings that give the target dimensions.
|
Re: Team 135 Field Done!
Quote:
|
Re: Team 135 Field Done!
Quote:
|
Re: Team 135 Field Done!
It's in the rules, section 6.2.6.
|
Re: Team 135 Field Done!
The field is not difficult to build this year. I made a quarter of the field in about 10 hours with only one other person helping.
Best of luck teams. |
Re: Team 135 Field Done!
I will have to get back to you on the foam, one of the students on the team said that we had ordered it and I will look into it.
And about facebook at school, you should make friends with your IT department, maybe get them as one of the mentors. I say that because I work for the IT department for our team's school, and they do get special treatment since I am a mentor. |
Re: Team 135 Field Done!
Quote:
|
Re: Team 135 Field Done!
Quote:
|
Re: Team 135 Field Done!
Quote:
Quote:
Quote:
|
Re: Team 135 Field Done!
Be wary, this can turn into a mentor/student build debate easily. If that's on your mind, I suggest searching any of the numerous wars (oops, threads) on here for the opinions previously posted.
Quote:
|
Re: Team 135 Field Done!
A decision by our students were that it was to be a studentr run team. They decide what they want to do and the mentors guide them in what they are doing. My favorite questions are, "What did we learn" and "What do YOU want to do next". If they are stuck I will give them some insite on what I think would be good. This program is about the students, not allowing them in on every step cheats them of the good that FIRST is about. Make them feel as though they are in full control of what happens.
|
Re: Team 135 Field Done!
Quote:
http://www.usfirst.org/uploadedFiles...10063_revA.ppt |
Re: Team 135 Field Done!
I have a question on the goals.
Is the height of the outside ramp the same as the height as the inside ramp where the two come together. From the drawings, it looks like the outside ramp is a little taller, creating a "drop" as the ball would roll over and into the goal area. |
Re: Team 135 Field Done!
Can you tell me the height of the ball return at its highest point. I know the tower is 7' and its 18' from center of bumper to alliance wall. What is the distance from the wall to the beginning of the ball return.:confused:
|
Re: Team 135 Field Done!
Wow you guys are fast! Good job
|
| All times are GMT -5. The time now is 14:23. |
Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi