Chief Delphi

Chief Delphi (http://www.chiefdelphi.com/forums/index.php)
-   General Forum (http://www.chiefdelphi.com/forums/forumdisplay.php?f=16)
-   -   Inspection Checklist posted! (http://www.chiefdelphi.com/forums/showthread.php?t=83131)

MrForbes 19-02-2010 21:13

Inspection Checklist posted!
 
The official FRC 2010 inspection checklist has been posted on the Game Manual page:


http://usfirst.org/uploadedFiles/Com...%20Rev%20A.pdf

Mike Betts 19-02-2010 21:54

Re: Inspection Checklist posted!
 
Please keep in mind that this is only rev A and rev B is already in the works.

That being said, I'm sure that all of the Robot Inspectors will value your constructive input.

Thanks,

Mike

MrForbes 19-02-2010 22:02

Re: Inspection Checklist posted!
 
I like it! The ??? for software versions is a humorous touch (although I doubt it was intended that way)

Mike Betts 19-02-2010 22:20

Re: Inspection Checklist posted!
 
Quote:

Originally Posted by squirrel (Post 924265)
I like it! The ??? for software versions is a humorous touch (although I doubt it was intended that way)

You mean that ??? is not the version you are running?

[Accent]
No inspection sticker for you... Two days...
[/Accent]

:D

Al Skierkiewicz 20-02-2010 01:45

Re: Inspection Checklist posted!
 
In the same area is the new Rev J of the robot rules Section 8. Please be aware that changes to the robot rules will be enforced at events. Inspectors will use the latest version of the rules and the inspection checklist at each event. Read and compete.

Gary Dillard 20-02-2010 07:41

Re: Inspection Checklist posted!
 
I have a question on "Intrusion of Balls Inside FRAME PERIMETER" - isn't that only a rules violation and penalty if it happens? It says under normal operation - couldn't your normal operation (by design) be to drive away from any ball headed for some area of your robot? I understand inspecting for this and flagging it to the officials, but it should not prevent the robot from failing inspection.

Brandon_L 20-02-2010 18:59

Re: Inspection Checklist posted!
 
Min of 12 gauge wire for 40 amp breaker?

so 14 is not ok?

Or am I reading it wrong?

Mike Betts 20-02-2010 19:08

Re: Inspection Checklist posted!
 
Quote:

Originally Posted by Brandon_L (Post 924789)
Min of 12 gauge wire for 40 amp breaker?

so 14 is not ok?

Or am I reading it wrong?

In accordance with <R47>:

Quote:

<R47> All active Power Distribution Board branch circuits shall be wired with appropriately sized wire:
A. 12 AWG (2.052mm) or larger diameter wire must be used for all circuits protected by a 40A circuit breaker.
B. 14 AWG (1.628mm) or larger diameter wire must be used for all circuits protected by a 30A circuit breaker.
C. 18 AWG (1.024mm) or larger diameter wire must be used for all circuits protected by a 20A circuit breaker.
D. 20 AWG (0.8128mm) or larger diameter wire must be used for the power connection between the Power Distribution Board and the cRIO-FRC .
E. 20 AWG (0.8128mm) or larger diameter wire must be used for the power connection between the Power Distribution Board and the Linksys Wireless Bridge
F. 20 AWG (0.8128mm) or larger diameter wire must be used for the power connections between the Power Distribution Board and the Analog Breakouts and/or Solenoid Breakout if individual power feeds are used. 18 AWG or larger diameter wire must be used if a common power feed is used for multiple breakouts.
G. 24 AWG (0.5106mm) or larger diameter wire must be used for providing power to pneumatic valves.
14 AWG wire gets a 30 amp (or smaller) circuit breaker.

Mike

Ether 20-02-2010 21:31

Re: Inspection Checklist posted!
 
Quote:

Originally Posted by Brandon_L (Post 924789)
Min of 12 gauge wire for 40 amp breaker?

so 14 is not ok?

Or am I reading it wrong?


This thread seems to suggest that the CIM motor wires are an exception:

http://www.chiefdelphi.com/forums/sh...ad.php?t=82190


~

Brandon_L 20-02-2010 22:17

Re: Inspection Checklist posted!
 
Ugh. We did all the 40 amps to the jags (there all jags...) in 14.....

Joe Ross 20-02-2010 22:29

Re: Inspection Checklist posted!
 
Quote:

Originally Posted by Brandon_L (Post 924954)
Ugh. We did all the 40 amps to the jags (there all jags...) in 14.....

Better to find out now when you have a few days to fix it, then at the competition.

Brandon_L 20-02-2010 22:32

Re: Inspection Checklist posted!
 
Quote:

Originally Posted by Joe Ross (Post 924966)
Better to find out now when you have a few days to fix it, then at the competition.

We don't even have any 12.

Gary Dillard 20-02-2010 22:47

Re: Inspection Checklist posted!
 
Quote:

Originally Posted by Brandon_L (Post 924971)
We don't even have any 12.

Then use 10; you got 10 feet each of red and black in the Kit of Parts.

Russ Beavis 21-02-2010 15:27

Re: Inspection Checklist posted!
 
Gary,
Regarding the distinction between CAPABLE and NOT INTENDED TO with respect to having balls intrude by more than 3" and whether such capability (regardless of intention) is a violation of rule <R19> (see below) - this sounds like a great question for the GDC and the formal Q&A. When I read the rules and crafted the checklist task, I interpreted the rule such that simply having the ability to intrude by > 3" was a violation of <R19>.

It can get even fuzzier - I saw a few robots at Suffield Shakedown with "squishy" barriers around their robot's lower perimeter (eg rubber bands or belts). It was very easy for the robot to "hop" over a ball and trap it underneath (even though, under normal operation, the "squishy" barrier did a fine job of keep balls from being lodged under the robot). In this case, I would have been tempted to allow the robot design to pass inspection and left enforcement of the (hopefully rare) ball entrapments to the referees.

A formal Q&A thread sounds like an appropriate action to take.

Russ

<R19> ROBOTS must be designed so that in normal operation BALLS cannot extend more than 3 inches inside
a) the FRAME PERIMETER below the level of the BUMPER ZONE (see Figure 8-5),
b) a MECHANISM or feature designed or used to deflect BALLS in a controlled manner that is above the level of the BUMPER ZONE.

Trying to Help 21-02-2010 15:29

Re: Inspection Checklist posted!
 
For those 4-H teams, have you used 4-H as your school name also?

Thank you,

Trying to Help


All times are GMT -5. The time now is 08:27.

Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi