Chief Delphi

Chief Delphi (http://www.chiefdelphi.com/forums/index.php)
-   Extra Discussion (http://www.chiefdelphi.com/forums/forumdisplay.php?f=68)
-   -   pic: Electrical hasn't gotten to the bridge yet so... (http://www.chiefdelphi.com/forums/showthread.php?t=91205)

NetPlanet 07-02-2011 21:42

pic: Electrical hasn't gotten to the bridge yet so...
 

jsmith296 07-02-2011 21:44

Re: pic: Electrical hasn't gotten to the bridge yet so...
 
Wow, the chassis guy who built that robot must have really put in a lot of time and effort to build that robot for his programming team....

Well done unknown chassis captain..

MathFreak 07-02-2011 22:09

Re: pic: Electrical hasn't gotten to the bridge yet so...
 
Quote:

Originally Posted by jsmith296 (Post 1018025)
Wow, the chassis guy who built that robot must have really put in a lot of time and effort to build that robot for his programming team....

Well done unknown chassis captain..

nice :/
it worked well...
but it had too much weight... 2 batteries is heavy!

MagiChau 07-02-2011 22:12

Re: pic: Electrical hasn't gotten to the bridge yet so...
 
Wait? Electrical isn't your programming team? Programming team spent all of today setting up the electrical for the 2011 bot instead of testing or doing programming. We still need to attach more wires for additional motors and other misc. stuff before plugging in camera, accelerometer, gyro, encoders etc.

MathFreak 07-02-2011 22:31

Re: pic: Electrical hasn't gotten to the bridge yet so...
 
Quote:

Originally Posted by ZonChau (Post 1018052)
Wait? Electrical isn't your programming team? Programming team spent all of today setting up the electrical for the 2011 bot instead of testing or doing programming. We still need to attach more wires for additional motors and other misc. stuff before plugging in camera, accelerometer, gyro, encoders etc.

It is.... there are 2 people (including me) who are actually working on programming and there is 1 mentor for programming and the 2 people is in electrical too

Al Skierkiewicz 08-02-2011 01:11

Re: pic: Electrical hasn't gotten to the bridge yet so...
 
Mike,
Before you take another picture, can you please insulate all the battery wiring terminals? The battery is capable of welding if a dropped tool falls across the bare metal. That dead short will get extremely hot, extremely fast and will damage the battery, possibly to the point of injuring someone. Inspectors are asked to stop any inspection until all terminals are insulated.

sanddrag 08-02-2011 03:15

Re: pic: Electrical hasn't gotten to the bridge yet so...
 
Quote:

Originally Posted by Al Skierkiewicz (Post 1018212)
Inspectors are asked to stop any inspection until all terminals are insulated.

Good. You wouldn't believe how many times in the past I'd find teams without insulated terminals. And at times, I thought I was the only inspector checking. I made teams show me all their batteries.

Al Skierkiewicz 08-02-2011 07:42

Re: pic: Electrical hasn't gotten to the bridge yet so...
 
Quote:

Originally Posted by sanddrag (Post 1018242)
Good. You wouldn't believe how many times in the past I'd find teams without insulated terminals. And at times, I thought I was the only inspector checking. I made teams show me all their batteries.

Please add "show me all your chargers" as well.

NetPlanet 09-02-2011 21:33

Re: pic: Electrical hasn't gotten to the bridge yet so...
 
Quote:

Originally Posted by Al Skierkiewicz (Post 1018212)
Mike,
Before you take another picture, can you please insulate all the battery wiring terminals? The battery is capable of welding if a dropped tool falls across the bare metal. That dead short will get extremely hot, extremely fast and will damage the battery, possibly to the point of injuring someone. Inspectors are asked to stop any inspection until all terminals are insulated.

We use transparent shrink rap on the terminals so that we could easily inspect the connections. It's hard to see in the photo.

Al Skierkiewicz 09-02-2011 22:18

Re: pic: Electrical hasn't gotten to the bridge yet so...
 
Quote:

Originally Posted by NetPlanet (Post 1019543)
We use transparent shrink rap on the terminals so that we could easily inspect the connections. It's hard to see in the photo.

Excellent!

RoboDawg 09-02-2011 22:54

Re: pic: Electrical hasn't gotten to the bridge yet so...
 
Nice! I thought we were the only team to use transparent heat shrink for the same reason! ( P.S. It also gives the inspectors something to catch until they see that it IS insulated.):p


All times are GMT -5. The time now is 07:55.

Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi