|
Re: Control system components and withholding allowance
The Blue Box under <R24>
Quote:
|
The primary intent of this rule is to allow teams to withhold the ROBOT control system, the OPERATOR CONSOLE, and selected relevant subsystems and access them after the shipping deadline. This will allow teams to have the maximum time possible prior to each competition event to develop and complete the software for their ROBOT while maximizing the potential capabilities provided by the control system.
|
__________________
"Rationality is our distinguishing characteristic - it's what sets us apart from the beasts." - Aristotle
|