Oddly enough, R96 was deleted:
Quote:
|
<R96> At the time of inspection, teams must submit an electronic copy of their Bill Of Materials (BOM) of all items used in the construction of their MINIBOT to the inspector. BOMs must be transferred to inspectors at the event via USB drive (inspector or team provided)
|
It seems strange to release an update regarding how KOP items are recorded on the BOM, then eliminate the BOM as part of inspection? What's the point?
EDIT: Oops, R96 was redundant to R82!