IndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond repute
Re: Power pole connector between pd and breaker

R37
D. The main 120-amp circuit breaker must be directly connected to the hot (+) leg of the ROBOT-side APP connector. Only one 120-amp main circuit breaker is allowed. This breaker must not be bypassed.


You answered your own question.
__________________
"Champions are champions not because they do anything extraordinary but because they do the ordinary things better than anyone else." —Chuck Knoll


2015 Indianapolis District Winner
2014 Boilermaker Regional Industrial Design Award
2013 Smoky Mountain Regional Industrial Design Award
2012 Boilermaker Engineering Excellence Award
2010 Boilermaker Rockwell Innovation in Control Award.
2009 Buckeye J&J Gracious Professionalism Award
2009 Boilermaker J&J Gracious Professionalism Award
2008 Boilermaker J&J Gracious Professionalism Award
2007 St Louis Regional Winners