View Single Post
  #40   Spotlight this post!  
Unread 05-05-2011, 22:28
Karibou Karibou is offline
Steel is love. Steel is life.
AKA: Kara Bakowski
FRC #0341 (Miss Daisy)
Team Role: Mentor
 
Join Date: Dec 2007
Rookie Year: 2008
Location: Conshohocken, PA
Posts: 1,852
Karibou has a reputation beyond reputeKaribou has a reputation beyond reputeKaribou has a reputation beyond reputeKaribou has a reputation beyond reputeKaribou has a reputation beyond reputeKaribou has a reputation beyond reputeKaribou has a reputation beyond reputeKaribou has a reputation beyond reputeKaribou has a reputation beyond reputeKaribou has a reputation beyond reputeKaribou has a reputation beyond repute
Send a message via AIM to Karibou
Re: Bills Blog- Yes, I’m already counting down to kickoff 2012

Quote:
Originally Posted by Alex2614 View Post
Is there any reason why they can't do it differently next year then? If they really want that concert, FIRST can something that integrates the stage and other elements that need to be in the dome (i.e. FTC or FLL fields, Einstein, Awards stage, etc.). If FIRST designed it, it could be used for both. If Will.I.Am is so supportive of FIRST, I think he can use a different stage. I mean, it can be the same dimensions and everything as the one used last week, but with easier integration with FIRST.

I don't know, maybe I'm sounding like a complete idiot (it's been known to happen with me, lol). I'm just throwing out random suggestions. It's just like kickoff day working on design and strategy - Stupid ideas are the best ones
I think that it's a matter of money. Those stages are EXPENSIVE, and take a lot of time and work to design, fabricate, and test. If the concert was to become an annual event (which we probably won't find out until CMP time next year), there might be a little bit of worth in it, but the best option would still be to use the same set-up as this year. From a physical space standpoint, you could probably cram all five FRC fields into the dome without the presence of a BEP-sized concert stage. I imagine that one contributing reason to their decision to not do it is that queuing and traffic flow would be an absolute nightmare.

Assuming there's no concert next year, it would make sense to use the extra space for a CARD field.
__________________
Kara Bakowski
Michigan Technological University///Materials Science and Engineering '15///Go Huskies! #tenacity
kabakowski(at)gmail(dot)com
FRC 341 (2016-present): Mechanical/build mentor
Volunteer (2010-present): MAR Seneca '17, FTC Hat Tricks Qualifier '16, Brunswick Eruption '16, MAR Montgomery '16, MAR Westtown '16 Portcullis Victim, MAR Springside-Chestnut Hill '16, Ramp Riot '15 '16, FiM Escanaba District '14 '15, MidKnight Mayhem '13 '15 '16, FiM Detroit District '13, IRI '10 '12, FiM Waterford District '11 '12, MARC '12, CMP Galileo '11
FRC 1189 (2008-2011): Team Captain, Pit Crew, Website group leader, Team Education group leader, Proud Alum. We've got spirit, yes we do...


WMWBS '10 '11
Reply With Quote