
31-12-2011, 16:21
|
 |
iScout
AKA: Brian, Frenchie, or that guy
 FRC #0461 (Westside Boiler Invasion)
Team Role: CAD
|
|
Join Date: Jan 2011
Rookie Year: 2010
Location: West Lafayette, IN
Posts: 224
|
|
|
Re: Practice Time
Quote:
Originally Posted by SuperNerd256
I understand how 2 weeks is a more viable option for top teams, but I've been researching bases like the kitbot on steroids and it seems to be something easily completed in a day or so. A simple electronics board can easily be mounted on from there, and you're set. If the game permits it, we should have our base done by Wednesday or Thursday, 4 or 5 days after. We plan to have the electronics for it being built at the same time, essentially having a drivable base by the end of the 1st week. I've read a lot about teams having whole bases and drives completed by the 2nd week, but with the method we're thinking of, it seems like a viable option to have it done in the 1st week. Is there anything I'm not getting here?
|
What you're missing is that the kitbot comes pre-designed and is ready to go together (with modifications if you so choose). Teams reaching for a week 2 drivebase are usually designing from scratch, so it takes them a little longer.
-Frenchie
__________________
"As a general rule, the most successful man in life is the man who has the best information." - Benjamin Disraeli (1804-81)
|