Thread: Practice Time
View Single Post
  #6   Spotlight this post!  
Unread 31-12-2011, 16:21
Frenchie461's Avatar
Frenchie461 Frenchie461 is offline
iScout
AKA: Brian, Frenchie, or that guy
FRC #0461 (Westside Boiler Invasion)
Team Role: CAD
 
Join Date: Jan 2011
Rookie Year: 2010
Location: West Lafayette, IN
Posts: 224
Frenchie461 is a jewel in the roughFrenchie461 is a jewel in the roughFrenchie461 is a jewel in the roughFrenchie461 is a jewel in the rough
Re: Practice Time

Quote:
Originally Posted by SuperNerd256 View Post
I understand how 2 weeks is a more viable option for top teams, but I've been researching bases like the kitbot on steroids and it seems to be something easily completed in a day or so. A simple electronics board can easily be mounted on from there, and you're set. If the game permits it, we should have our base done by Wednesday or Thursday, 4 or 5 days after. We plan to have the electronics for it being built at the same time, essentially having a drivable base by the end of the 1st week. I've read a lot about teams having whole bases and drives completed by the 2nd week, but with the method we're thinking of, it seems like a viable option to have it done in the 1st week. Is there anything I'm not getting here?
What you're missing is that the kitbot comes pre-designed and is ready to go together (with modifications if you so choose). Teams reaching for a week 2 drivebase are usually designing from scratch, so it takes them a little longer.

-Frenchie
__________________
"As a general rule, the most successful man in life is the man who has the best information." - Benjamin Disraeli (1804-81)
Reply With Quote