Quote:
Originally Posted by Herbblood
The idea is very interesting, in the rules it says that the robot must be balanced on the bridge. It would be balenced on the ground, yet still in terms "on" the bridge.
Niot sure honestly if you could do it, should ask the Q and A when it opens if the majority of the robot need to be on the bridge.
|
That's not exactly what I was getting at. G40 says that robot(s) get points for being on a balanced bridge, which section 2.2.5 defines as within 5 degrees of horizontal. Unless I'm missing it, the rules never say the robot needs to be completely on or supported by the alliance bridge.
The question becomes is a robot that has an appendage resting on top of the bridge considered 'on the bridge'?
I think the answer is yes which should result in a rule change in the next update.