Thread: Bridge question
View Single Post
  #1   Spotlight this post!  
Unread 14-01-2012, 18:22
Jim Wilks Jim Wilks is offline
Electrical Engineer
AKA: Jim Wilks
FRC #1360 (Orbit Robotics)
Team Role: Mentor
 
Join Date: Feb 2008
Rookie Year: 2008
Location: Oakville, ON
Posts: 1,186
Jim Wilks has a reputation beyond reputeJim Wilks has a reputation beyond reputeJim Wilks has a reputation beyond reputeJim Wilks has a reputation beyond reputeJim Wilks has a reputation beyond reputeJim Wilks has a reputation beyond reputeJim Wilks has a reputation beyond reputeJim Wilks has a reputation beyond reputeJim Wilks has a reputation beyond reputeJim Wilks has a reputation beyond reputeJim Wilks has a reputation beyond repute
Re: Bridge question

Quote:
Originally Posted by Brainless96 View Post
It took 60 lbs on each side to keep the batteries at 28 inches on the better side (the one that will go to 16 in before tipping). With 60 lbs on each side it makes transporting it a real problem so it is not very practical to use this as a final solution.
Just make the 60lbs on each side removable and transport as before.
Reply With Quote