View Single Post
  #2   Spotlight this post!  
Unread 18-01-2012, 14:28
Mk.32's Avatar
Mk.32 Mk.32 is offline
Registered User
AKA: Mark
FRC #2485 (W.A.R. Lords)
Team Role: Engineer
 
Join Date: Jan 2011
Rookie Year: 2011
Location: San Diego
Posts: 770
Mk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud of
Re: Built Bridge Problems

A bridge built out wood and based on the drawings that FIRST gave us does not give you the proper balance and properties. You need to add weight to the ends to make it performance like the one used on the game fields [which are metal].
__________________
Engineering mentor: Team 2485: WARLords 2013-

Team President: Team 3647 2010-2013

Last edited by Mk.32 : 18-01-2012 at 14:42. Reason: For clarity
Reply With Quote