Re: The end of week 3
Our team also has a small design team. Our major put back right now is continuous prototyping. As soon as we decide on something, we think of a problem that can happen and have to fix it in a prototype before we can finalize that design. Our drive train is set, pieces cut ready to be welded, design is close to being done (yet still behind schedule). We planned out our weeks to have about a week of practice time with our bot until bag day, so any progress we get behind on will only take away practice time (still vital to the team, not as vital as a working bot is to the team)