Quote:
Originally Posted by junefish
[font=Arial][color=Teal]
[font=Arial][color=DarkRed]
Wow, I'm really impressed with how much you guys have done so far We've basically CAD'd the drive train, and have ordered/received a lot of parts, but we don't have much in the way of physical assemblies yet. We've been mostly doing analysis for the other subsystem--time consuming but (hopefully) a huge payoff in competition. It's amazing how minor variance in motor speed and ball compression affects the arc of a shot. Programming and electrical are well underway, as well.
Good luck to everyone for the last 2 weeks!
|
Well, you are Beach City Robotics, so I think you'll have a successful year! Like I've said on many other posts before: 2 weeks (and 3 days) is a lot of time!
My team
literally just took our entire robot apart today, redesigned parts of it, and put it all back together! In our one practice round we made about 6 points every 20 seconds or so (We only have 3 balls). And that was without any misses. That's all I'm going to say about our robot for now, but look forward to a great season from 256!