View Single Post
  #64   Spotlight this post!  
Unread 14-02-2012, 16:47
EricLeifermann's Avatar
EricLeifermann EricLeifermann is offline
That was a short break
FRC #2826 (Wave Robotics)
Team Role: Engineer
 
Join Date: Jan 2007
Rookie Year: 2001
Location: Wisconsin
Posts: 1,075
EricLeifermann has a reputation beyond reputeEricLeifermann has a reputation beyond reputeEricLeifermann has a reputation beyond reputeEricLeifermann has a reputation beyond reputeEricLeifermann has a reputation beyond reputeEricLeifermann has a reputation beyond reputeEricLeifermann has a reputation beyond reputeEricLeifermann has a reputation beyond reputeEricLeifermann has a reputation beyond reputeEricLeifermann has a reputation beyond reputeEricLeifermann has a reputation beyond repute
Re: The Ultimate Game-Breaker Robot: 2012 Edition

The ball ramp is no longer considered part of the bridge. This strategy is now out.

What physical parts make up the bridge by definition? Essentially, where does the bridge begin and end? For example, does the welded structure under the bridge that the top connects to count as the bridge? Does the lateral bar that rotates with the bridge that count as the bridge? FRC2826 2012-01-17
A. The Bridge is defined as all components depicted in GE-12017, with the exception of the Bridge Base (GE-12022) and the Ball Ramps (GE-12064). Updated per Team Update 2012-02-14.
__________________
2002-2005 Appleton East High School: Team 93
2005-2011 Michigan Technological University: Team 857
2012-Present Wave Robotics Team 2826




Last edited by EricLeifermann : 14-02-2012 at 16:50.