|
Re: Team 701's 2012 Electronics
Steven,
Very nice job. I like that the critical components are visible for inspection. All the LEDs on the PD, DSC, Crio and radio are in a position that diagnostics will be easy. Nice job on the battery case and insulation where needed. I am guessing that the battery will have a hold down since everything else is so well done. Your inspector will likely ask about the switch on the back of your bridge but I don't think he/she will have any problems inspecting your electrical system. Congratulations on a nice job.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.
|