View Single Post
  #4   Spotlight this post!  
Unread 16-02-2012, 22:58
zero118 zero118 is offline
Registered User
FRC #2410
 
Join Date: Feb 2012
Location: United States
Posts: 5
zero118 is an unknown quantity at this point
Re: Using Proxy Switch to Calculate RPM

Thank you for the reply! I will make sure to try that tomorrow.

I did notice that the timed tasks VI is outside the loop that contains the teleop VI. Does that mean that inside the time tasks VI, I should perform the above calculations in a while loop rather than a sequence structure?

Thanks!