Re: PD Board Legality Question
I've also implemented an emergency repair of this (on the positive side) using three 40 A breaker slots in parallel, with leads running back to the 120 A circuit breaker terminal. If I remember correctly, this was used on practice day, while a spare was being acquired from the spare parts desk, and installed after practice ended for the day.
(Erik would know if this will compromise the circuit-breaker fault indicators—but I didn't care about those, because several were defective already, and this whole PDB was going to be trash very soon.)