|
Re: 2012 Bill of Materials
[R13]
The total cost of all non-KOP items shall not exceed $3,500.00 USD. All costs are to be determined as explained in
Section 4.1.3: Budget Constraints.
The following items are excluded from the total cost calculation:
A. items listed on any KOP Checklist (qty is limited to the total listed in the most recent checklist),
B. items obtained via a Product Donation Voucher included in the KOP,
C. items ever distributed to the team via FIRST Choice,
D. any non-functional decorations,
E. individual fasteners, adhesives, or lubricants that are less than $1.00 each,
F. spare parts, and
G. parts of the Operator Console.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.
|