View Single Post
  #30   Spotlight this post!  
Unread 21-02-2012, 13:50
Steven Donow Steven Donow is offline
Registered User
AKA: Scooby
no team
Team Role: College Student
 
Join Date: Apr 2010
Rookie Year: 2009
Location: Boston, MA
Posts: 1,335
Steven Donow has a reputation beyond reputeSteven Donow has a reputation beyond reputeSteven Donow has a reputation beyond reputeSteven Donow has a reputation beyond reputeSteven Donow has a reputation beyond reputeSteven Donow has a reputation beyond reputeSteven Donow has a reputation beyond reputeSteven Donow has a reputation beyond reputeSteven Donow has a reputation beyond reputeSteven Donow has a reputation beyond reputeSteven Donow has a reputation beyond repute
Re: 2012 Bill of Materials

Quote:
Originally Posted by Al Skierkiewicz View Post
[R13]
The total cost of all non-KOP items shall not exceed $3,500.00 USD. All costs are to be determined as explained in
Section 4.1.3: Budget Constraints.
The following items are excluded from the total cost calculation:
A. items listed on any KOP Checklist (qty is limited to the total listed in the most recent checklist),
B. items obtained via a Product Donation Voucher included in the KOP,
C. items ever distributed to the team via FIRST Choice,
D. any non-functional decorations,
E. individual fasteners, adhesives, or lubricants that are less than $1.00 each,
F. spare parts, and
G. parts of the Operator Console.
The question with that is, is it the most recent checklist, ie. this years, or the most recent with THAT item? And for Banebots, would we deduct the motors that were given last year or the 30 dollars given this year?

Last edited by Steven Donow : 21-02-2012 at 13:52. Reason: made a small edit and accidently erased entire post...
Reply With Quote