|
Re: Tips from a veteran Robot Inspector
Quote:
Originally Posted by Al Skierkiewicz
Gary,
We don't track spares on the BOM. With this rule...
The following items are excluded from the total cost calculation:
A. items listed on any KOP Checklist (qty is limited to the total listed in the most recent checklist),
I would say if it was listed on a previous year's KOP checklist then it is excluded.
|
I missed that change in the rule, that is a huge difference from past years.
Thanks Al.
__________________
Close enough to taste it, too far to reach it
|