View Single Post
  #4   Spotlight this post!  
Unread 06-01-2003, 13:46
Unsung FIRST Hero
Rich Wong Rich Wong is offline
NYC FIRST Planning Committee Member
no team (NYC FIRST)
Team Role: Mentor
 
Join Date: Jan 2002
Rookie Year: 1999
Location: Brooklyn, NY
Posts: 1,674
Rich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond repute
Send a message via AIM to Rich Wong
NYC R-Kickoff Ramp Structure BOM

FYI:
NYC Remote Kickoff (cheapest!) BOM of Ramp Structure:
$230 for 2 ramps and 1 platform.

Everything is from Home Depot minus the 2 wire mesh floor.

-----------------------------
A single ramp
5 2x6x8 ft.
1 2x6x4 ft.
1 2x4x4 ft.
-----------------------------
Single Ramp side panels
2 2x4x1/4 plywood
1 1x6x8 ft. (side rail)
-----------------------------
A single platform Section
5 2x6x 5'9" (use end pieces for legs)
2 2x6x 4 ft.
4 2x6x 1'11.5" (see item 1)
2 2x4x 3'10.5"
2 1x4x 5'9"
-----------------------------
Platform floor
3 2x4x1/4 plywood
-----------------------------
Platform side panel
1 2x4x1/4 plywood
-----------------------------
2 4x8 wire mesh ($50 each)