View Single Post
  #11   Spotlight this post!  
Unread 10-03-2012, 18:53
crazyStone crazyStone is offline
Cad posessed
AKA: Derek Stone
no team (Charger Robotics)
Team Role: CAD
 
Join Date: Mar 2011
Rookie Year: 2010
Location: Sussex, WI
Posts: 41
crazyStone has a spectacular aura aboutcrazyStone has a spectacular aura aboutcrazyStone has a spectacular aura about
Re: pic: A Beautiful Mess?

Quote:
Originally Posted by PAR_WIG1350 View Post
The relief valve MUST be connected to the compressor by only brass fittings. The tanks are not brass fittings. The relief valve must be before any hoses, tanks, valves (except for the factory installed check valve), or regulators. The check valve is the small hexagonal piece directly mounted to the compressor. This is allowed since it is factory installed, but every thing in between this component and the relief valve must be BRASS.
now I am really confused, This is what first puts as their diagram...
http://www.usfirst.org/sites/default/files/uploadedFiles/Robotics_Programs/FRC/Game_and_Season__Info/2012_Assets/2012%20FIRST%20Robotics%20Competition%20Pneumatics %20Manual.pdf

Page 8

That is going compressor, storage tanks, relief valve/ regulator....

Any clarification would be great.
Reply With Quote