Thread: 2002 Build.....
View Single Post
  #9   Spotlight this post!  
Unread 02-01-2002, 21:40
Unsung FIRST Hero
Ed Sparks Ed Sparks is offline
Engineer/Mentor/Inspector
AKA: FirstCadLibrary Guy, Inspector Dude
FRC #3959 (Formally with FRC-34)
Team Role: Engineer
 
Join Date: Jul 2001
Rookie Year: 1996
Location: Huntsville, Alabama
Posts: 620
Ed Sparks has a reputation beyond reputeEd Sparks has a reputation beyond reputeEd Sparks has a reputation beyond reputeEd Sparks has a reputation beyond reputeEd Sparks has a reputation beyond reputeEd Sparks has a reputation beyond reputeEd Sparks has a reputation beyond reputeEd Sparks has a reputation beyond reputeEd Sparks has a reputation beyond reputeEd Sparks has a reputation beyond reputeEd Sparks has a reputation beyond repute
Send a message via AIM to Ed Sparks Send a message via Yahoo to Ed Sparks
Foam ?

I'm assumming your talking about expandable foam (the stuff in a can that is used as an insulator.

However,

I've never seen this material on any additional materials list. The only foam I ever remember that was legal was the rhocell (spelling) we were given years ago.

I don't think you could legally fill copper tube with foam besides, we usually don't have that much copper tube (10' max) to work with.

Go with extruded aluminum. You'll never look back and regret it.
__________________
Ed Sparks

MECH TECH FRC-3959