|
Re: pic: 2012 1717 Wheel Module Photo 4
Quote:
Originally Posted by SuperNerd256
I think the "2000 hours" is collectively over the course of the 4 year time period in which they started using swerve. It could be in one build season, but like you said it would be tough.
|
The context of the conversation with the mentor was the work required over one season including the pre-season. The point he made to me was to get as much work done during the pre-season our else one will never get the swerve drive done.
I actually typed it wrong. He told it was actually 3000 hours 
__________________
Team 3476| Mentor| 2014 - Current
Team 3309| Mentor| 2011 - 2016
Team 766 | Mentor| 2006 - 2011 | Alumnus | 2002-2005
|