Re: Building the Structure of the Robot?
Week 1: Preliminary Design, Prototype, have a CAD for the drivetrain done by at least the end of this week(preferably earlier) so that you can start to/send out parts to be machined at the end of the week.
Week 2-3: CAD and machine parts as you finalize the CAD
Week 4: CAD is done. Finish up machining by the end of the week so that you can assemble the robot during the weekend.
Week 5-6: Program and ITERATE!
Feel free to adjust this schedule to your team, but you should definitely have at least a week before you bag the robot to program and iterate.
|