View Single Post
  #2   Spotlight this post!  
Unread 05-01-2013, 21:36
protoserge's Avatar
protoserge protoserge is offline
CAD, machining, circuits, fun!
AKA: Some call me... Tim?
FRC #0365 (MOE) & former 836 Mentor)
Team Role: Mentor
 
Join Date: Jan 2012
Rookie Year: 2002
Location: Wilmington, DE
Posts: 754
protoserge has a reputation beyond reputeprotoserge has a reputation beyond reputeprotoserge has a reputation beyond reputeprotoserge has a reputation beyond reputeprotoserge has a reputation beyond reputeprotoserge has a reputation beyond reputeprotoserge has a reputation beyond reputeprotoserge has a reputation beyond reputeprotoserge has a reputation beyond reputeprotoserge has a reputation beyond reputeprotoserge has a reputation beyond repute
Re: Building the Element

Quote:
Originally Posted by jvriezen View Post
We built the team pyramid for the Rochester, MN kick off with a few modifications from the plan..

We used EMT instead of black iron pipe. We made the joint plates a bit bigger and use conduit clamps instead of U-Bolts (much cheaper than U-bolts and we also got the EMT and clamps donated by our electrical supply house sponsor.

We also found that if we removed the top goal, and six of the horizontal rungs (on opposing sides) what is left are two A frames -- these fit through a standard commercial doorway (not sure of the door way dimensions but it was the school cafeteria doors. Now the big pieces are stored in the schools maintenance area. Not sure when we'll be putting it back together.. We'll probably build a mock pyramid with just essential elements that we want to use for climbing.
How does it "feel"?
Reply With Quote