Re: Building the Element
I plan to help build the pyramid so I did a little reading today. I noticed the team drawing design and the competition design have minor differences in specifications. The team drawing calls for 1 1/4" pipe (1.66 o.d.) with a 60 degree pyramid angle while the competition design calls for 1 1/2" tubing (1.5" o.d. plus powder coating) with a 68 degree pyramid angle. So, which design will we build!!!
|