View Single Post
  #33   Spotlight this post!  
Unread 08-01-2013, 09:46
MrForbes's Avatar
MrForbes MrForbes is offline
Registered User
AKA: Jim
FRC #1726 (N.E.R.D.S.)
Team Role: Mentor
 
Join Date: Feb 2006
Rookie Year: 2006
Location: Sierra Vista AZ
Posts: 6,038
MrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond repute
Re: Building the Element

Code:
G02

Teams may not climb on the PYRAMID.

Violation: YELLOW CARD
I was thinking we might want to implement this rule during build season....

We are planning on building enough of a pyramid to test our robot's ability to climb it. So far, it looks like we'll need one horizontal bar, 30" off the floor. We haven't figured out a way to climb any higher than that.

I priced .095" wall 1.50" structural steel tube at the local welding/steel supplier, it goes for $2.00/ft in full lengths (20 ft), and $2.50/ft if cut to a specific length. How much do we need?
Reply With Quote