View Single Post
  #3   Spotlight this post!  
Unread 19-01-2013, 14:45
EricH's Avatar
EricH EricH is offline
New year, new team
FRC #1197 (Torbots)
Team Role: Engineer
 
Join Date: Jan 2005
Rookie Year: 2003
Location: SoCal
Posts: 19,789
EricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond repute
Re: Electrical connection between cut off switch and power distribution board

I disagree with Jason. I interpret "shall be" to mean "you must do it this way", and with the other wiring rules using "minimum" to refer to a wire gauge (i.e., you can use larger wire, but you have to use wire), so no bus bar.

Given that two experienced FIRSTers with inspection experience disagree, I strongly recommend Q&A (nobody's asked this one yet)--and then make sure to bring documentation with you, including the Q&A, at the event if it is ruled legal.
__________________
Past teams:
2003-2007: FRC0330 BeachBots
2008: FRC1135 Shmoebotics
2012: FRC4046 Schroedinger's Dragons

"Rockets are tricky..."--Elon Musk