|
Re: Power Distribution Board visibility for inspection
Post a picture of the current electronics set up.
Field personnel really need to have easy crio, radio, and main breaker accessibility. Safety is also a significant issue behind this rule.
Also if you plan on hanging, and having anything in zone 3, (even if its a 1/4" of aluminum) make sure you can turn the robot off from the ground easily.
|