View Single Post
  #5   Spotlight this post!  
Unread 08-02-2013, 22:29
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,795
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Re: Location of the PD Board

All,
The rule exists so that inspectors can be sure you have the legal breakers installed, that the breaker meets the minimum wire size for the rating and that there is only wire in each WAGO terminal. We then check to see that the radio is wired correctly as is the Crio. During Power On testing we also check to see that all LEDs are lit. We will work with you if your design requires a special mounting, access or cover, but if you make impossible to see the above conditions you will have to correct it.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.