Quote:
Originally Posted by markmcgary
Yep. They should fix T08: "At the time of Inspection, the ROBOT must be presented with all MECHANISMS (including all COMPONENTS of each MECHANISM), configurations, and decorations that will be used on the ROBOT." PERIOD. And remove "during the entire competition event." from the rule.
|
I disagree. "Used on the robot"... for the next match? ...for the rest of Friday?
I read "during the entire competition event" combined with T10 to mean "used on the robot" ...from the time of THAT inspection until the end of the event OR until a new inspection is performed.
IMO, reading "during the entire competition event" to mean the robot can only include mechanisms present at the initial inspection is "lawyering" this rule. Again--just my opinion.
Quote:
|
Originally Posted by MooreteP
Watching teams engaged in design iteration during the limited window of Thursday practice, then in between Friday and Saturday matches, is like Jazz.
|
This! I've seen one season of ours rescued by the pursuit of a complete re-design due to major systems failures. The re-design didn't work out either, but it sure kept spirits up heading into eliminations. To me, that is much more the spirit of FIRST...