Quote:
Originally Posted by Gregor
|
Strength of schedule compares predicted rank in a given schedule (as posted, what you linked) to the average difficulty of a schedule.* There are several ways to do it, though I'm a fan of the
Joe Ross method.
*Apologies, this is a terrible description based on trying to generalize a few different methods non-technically.