Quote:
|
Originally Posted by DevenStonow
In regards to the shift to Saturday-Sunday, with the shift to districts, it's kind of an inevitability, as it's much easier to have events at a HS without having to worry about interfering with the Friday school day(all that directly coincides with it is setup for the field, so all the school really has to do is just move gym classes/restrict parking).
|
Field can be installed starting at the closing bell, including laying down the floor protection sheets, and still be done by evening. Well, except for those durn electronics boxes.

Did that for Mainely SPIRIT.
Speaking of which (in a
very round-about way), do the District teams (specifically the NE district) get to go in the night before to unpack/get inspected? Or is first morning a mad house adventure? How are the existing districts schedules set up, and what can we look forward to?