View Single Post
  #6   Spotlight this post!  
Unread 17-09-2013, 00:54
jspatz1's Avatar
jspatz1 jspatz1 is offline
Registered User
AKA: Jeff
FRC #1986 (Team Titanium)
Team Role: Mentor
 
Join Date: Jan 2008
Rookie Year: 2007
Location: Lee's Summit, MO
Posts: 835
jspatz1 has a reputation beyond reputejspatz1 has a reputation beyond reputejspatz1 has a reputation beyond reputejspatz1 has a reputation beyond reputejspatz1 has a reputation beyond reputejspatz1 has a reputation beyond reputejspatz1 has a reputation beyond reputejspatz1 has a reputation beyond reputejspatz1 has a reputation beyond reputejspatz1 has a reputation beyond reputejspatz1 has a reputation beyond repute
Send a message via AIM to jspatz1
Re: How are the actuation cables in multi-stage telescoping lifts tensioned?

In both our cascade-rigged telescopic lift in 2011, and our continuous-rigged telescopic lift this year (2013), we maintained tension and accommodated small variations in overall length by terminating the cable with a strong extension spring. The spring takes up variations in the rigging length as the apparatus extends and retracts, and is placed on the non-loaded side (or "down" side) of the rigging. A small loop of slack cable is also placed around and parallel to the spring as a shock cord, to create a maximum limit to how much the spring can stretch. This protects the spring in cases where the mechanism gets caught or snags, and the down direction sees a high load.
Attached Thumbnails
Click image for larger version

Name:	Spring rigging.jpg
Views:	204
Size:	9.7 KB
ID:	15222  
__________________

Last edited by jspatz1 : 17-09-2013 at 01:02.