View Single Post
  #3   Spotlight this post!  
Unread 17-10-2013, 08:07
Qbot2640's Avatar
Qbot2640 Qbot2640 is offline
Registered User
AKA: Terry McHugh
FRC #2640 (Hotbotz)
Team Role: Mentor
 
Join Date: Sep 2012
Rookie Year: 2012
Location: Reidsville, NC
Posts: 473
Qbot2640 has a reputation beyond reputeQbot2640 has a reputation beyond reputeQbot2640 has a reputation beyond reputeQbot2640 has a reputation beyond reputeQbot2640 has a reputation beyond reputeQbot2640 has a reputation beyond reputeQbot2640 has a reputation beyond reputeQbot2640 has a reputation beyond reputeQbot2640 has a reputation beyond reputeQbot2640 has a reputation beyond reputeQbot2640 has a reputation beyond repute
Re: Electrical Connectors

Quote:
Originally Posted by stinglikeabee View Post
What you are asking is actually a fairly good design practice for a competition robot, even if you had extra control system in your inventory. The ease of access and serviceability will save you a huge hassle later on.
Plus, we usually create our drive base first, then we find that we have to cover everything up with a big towel when we drill or cut on a new superstructure. It would be nice to pull all the sensitive electronics out for protection.

Thanks for those suggestions...I'll look into that.
__________________

2012 Palmetto Regional Winners (Thanks 2059, 2815, and 287).
2012 Newton 14th Seed
2013 Chesapeake Regional Imagery Award Winners
2014 North Carolina Regional Imagery Award Winners
2014 Greater DC Regional Team Spirit Award Winners
2015 North Carolina Regional Finalists (Thanks 3971 and 587)