Quote:
Originally Posted by George C
We did something similar for a two-stage cascading mechanism driven by a Gates belt. We were able to saw and file a piece of aluminum to match the Gates tooth profile. The block covered about 6 teeth and we avoided putting holes through the belt. Worked perfectly on the second try.
|
971 did a similar attachment method with a machined block to match the belt tooth profile for their elevator in 2011.
For #25 chain, you can fit #4 screws through the gaps between the rollers to fix it to something, although I don't know if this is how 233 does it or not. Another method is to drill a hole in the fixed structure that one end of a masterlink fits through.